Before I pulled my hair out with the program pulled my hair out with scheduling inside of AutoCAD MEP 2008. Once I figured out how to properly setup a schedule using property data sets calculating the materials was a breeze. This method had some hiccups in it as well. To schedule pipe lengths and add their totals up and give you a sum the easiest way I could find was to isolate each pipe size and the create a schedule for every size. The only way you could isolate pipes based on their size was to have all the piping into one drawing which made my machine puke on several occasions. The fittings and MvParts were no problem to schedule. I could even schedule them through xrefs and the schedules updated when changes were made. When I schedule piping through xrefs it would spit out on large table with only a sum of all pipe in the drawing instaed of a sum of each specific size. I think the next release of QTO will be benificial to purchase, but for know I will continue to pull my hair out with only one program. I found a clip on You Tube with Brian Haines giving a demonstration as well.
http://www.youtube.com/watch?v=q90ynbvQo40
No comments:
Post a Comment